1. Which two tasks focus on discussing the network implementation strategy with key stakeholders and business owners? (Choose two.)
A. rollback and contingency plans
B. resource requirements and tools to perform network operations testing
C. site remediation, plans, and execution status
D. site survey results
Answer: C, D

2. Which service component within the plan phase prescribes a set of activities and tasks to assess existing network infrastructure and applications to verify their ability to support the proposed routing and switching solution for a customer?
A. Deployment Project Management
B. Operations Readiness Assessment
C. Security Vulnerability Assessment
D. Site Readiness Assessment
E. Network Readiness Assessment
Answer: E

3. Which three activities within the plan phase are performed when assessing network vulnerabilities and identifying steps needed to address security threats and attacks? (Choose three.)
A. Produce network security specifications and requirements.
B. Identify, analyze, and document existing network vulnerabilities.
C. Produce security vulnerability report.
D. Assess current network infrastructure and network security procedures.
E. Document the existing network environment.
F. Document the network vulnerabilities and determine the level of criticality for remediation.
Answer: B, C, E

4. What are two typical activities that are conducted as part of Security Assessment? (Choose two.)
A. Perform intrusion audits.
B. Assess network infrastructure software and configurations.
C. Create a performance baseline for Security Assessment.
D. Categorize security incidents.
Answer: A, C

5. Which task is conducted as part of Business Readiness Testing?
A. Identify, select, and assess network management tools, features, and functionality.
B. Obtain and review security procedures and policies.
C. Use predetermined use cases or design use cases based upon validated business and operational requirements.
D. Review network implementation strategy.
Answer: C

6. Which two items on the design discovery checklist are used to create a low-level design? (Choose two.)
A. technical requirements
B. capacity planning
C. design goals
D. WAN modeling
Answer: A, C

PDF VERSION OF THE EXAM
http://www.certifyme.com/demos/646-058.zip

Official Page for the Exam
646-058 Braindumps 100% Pass Guaranteed at First Attempt - CertifyMe
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 09:38 PM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
SEO by vBSEO 3.3.0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21